The new Museum of London is set to open towards the end of 2026 in the heart of the historic City of London, creating a major new destination for learning, exploration and culture.
The redevelopment will transform the formerly derelict Victorian General Market building into a new museum space, housing permanent galleries and showcasing more of the museum’s collection than ever before.
The transformation has involved the careful restoration and adaptation of a complex existing structure, including the cleaning of 10,000 square metres of brickwork, roof reinforcement and the excavation of an extensive network of rediscovered vaults. A live train line also runs alongside the subterranean gallery space, creating a unique connection between the museum and London’s transport heritage.
Museum of London 2025-2027
Cultural / Heritage / Public Attraction
Phoenix ME
Former Victorian General Market building
MEP commissioning management
Managing testing activities across modern building services within an existing heritage structure
Museum redevelopment and fit out
The project presented a highly complex commissioning environment, combining the challenges of an existing heritage frame with the installation of modern building services.
Adapting historic spaces to meet the technical requirements of a contemporary museum demanded careful coordination, structured testing and close management across multiple MEP systems.
With subterranean spaces, gallery environments, event spaces, modern infrastructure and operational constraints, ENVIRO’s role required strong technical oversight and clear control of commissioning activity throughout the project.
ENVIRO was contracted to provide MEP commissioning management and validation services for the project close-out phase.
The scope included managing commissioning activity across 24/7 shift patterns, supporting remedial water treatment, maintaining continued water management through to floor close-out, driving HVAC balancing teams to completion and ensuring commissioning documentation was reviewed, approved and signed off.
Employed by Phoenix ME, ENVIRO was appointed to provide MEP commissioning management services across the project.
The ENVIRO team became a key part of the delivery process, managing testing activities and supporting the coordination of modern services within the existing building structure.
The approach focused on maintaining control across mechanical and electrical systems, supporting commissioning readiness, coordinating testing requirements and helping ensure that systems were progressed in a structured and compliant manner.
Verifying the current condition of mechanical systems on site.
Aligning outstanding commissioning actions with the wider project team.
Driving remedial works and progress across active work areas.
Maintaining clear documentation control through to handover.
The Museum of London redevelopment is an exceptional project due to the nature of the existing building and its transformation into a modern public museum.
The project combines heritage restoration, complex structural adaptation and the integration of modern MEP services across a landmark cultural destination.
The presence of a live train line alongside the subterranean gallery space adds a further layer of complexity, creating a distinctive visitor experience while requiring careful coordination during delivery.
Phoenix Mechanical Electrical delivered a comprehensive electrical services installation to support the operational demands of 21 Moorfields. This included small power, general power, UPS and lighting distribution boards, with dual supplies provided to key trader floors.
The wider installation included LV and MV fit out and distribution, general switchgear, base build MV supply, earthing and bonding, lighting control systems, general and emergency lighting, high-level power and cleaners’ circuits.
ENVIRO’s role focused on supporting the commissioning management, validation and close-out of MEP systems to help ensure the building could progress towards successful handover.
ENVIRO has supported Phoenix ME through a complex MEP commissioning management process on one of London’s most significant cultural redevelopment projects.
By managing testing activities across key mechanical and electrical systems, ENVIRO has helped provide structure, coordination and technical control throughout the commissioning process.
The project represents an important example of ENVIRO’s ability to support technically challenging construction projects where modern building services must be integrated into complex existing environments.