Project GOAT is the internal construction industry designation for HSBC’s relocation to its The £200m+ project will transform an outdated office block into a modern, sustainable office building ahead of HSBC’s planned transition from Canary Wharf in 2027.
New global headquarters at 81 Newgate Street in the City of London.
The refurbishment covers approximately 556,000 sq ft and has been designed around a strong sustainability strategy, retaining, repurposing and recycling wherever possible. The project has successfully retained 76% of the existing structure, with 95% of waste diverted from landfill. The scheme is targeting a net zero operational carbon strategy for base build energy consumption, supported by an all-electric building design. It also aims to achieve BREEAM Outstanding, WELL Platinum and WiredScore Platinum ratings.
Project GOAT, 2025-2027
Commercial / Financial Services
T Clarke
Approximately 556,000 sq ft
MEP commissioning management
MEP commissioning, infrastructure upgrades, heat-load testing, IST scripting and integrated testing
Major headquarters relocation, refurbishment and fit out
1,800+ ATPs to be managed and issued
HSBC
Project GOAT is a large-scale headquarters refurbishment and fit out involving extensive MEP systems, upgraded infrastructure and integrated testing requirements.
The project combines a major commercial fit out with significant LV and mechanical infrastructure upgrades, creating a technically demanding commissioning environment across electrical, mechanical, security and fire systems.
With more than 1,800 ATPs to manage and issue, alongside heat-load testing, integrated system testing and complex handover requirements, the project requires strong commissioning leadership, structured documentation control and close coordination across multiple workstreams.
ENVIRO was contracted to provide MEP commissioning management and validation services for the project close-out phase.
The scope included managing commissioning activity across 24/7 shift patterns, supporting remedial water treatment, maintaining continued water management through to floor close-out, driving HVAC balancing teams to completion and ensuring commissioning documentation was reviewed, approved and signed off.
Employed by T Clarke, ENVIRO was appointed to provide MEP commissioning management across the project.
The team has taken control across electrical, mechanical, security and fire services, supporting the project through a demanding commissioning and handover programme.
ENVIRO has led the authoring of heat-load test scripts and integrated system testing scripts, while also leading integrated testing activities across key systems.
The team’s approach has focused on maintaining technical control, coordinating testing progression and supporting the wider project team through a complex fit-out and infrastructure upgrade environment.
Verifying the current condition of mechanical systems on site.
Aligning outstanding commissioning actions with the wider project team.
Driving remedial works and progress across active work areas.
Maintaining clear documentation control through to handover.
Project GOAT is more than a standard commercial fit out. Alongside the interior transformation, the project includes upgraded LV infrastructure and mechanical services, requiring commissioning management across both fit-out and infrastructure scopes.
The sustainability-led refurbishment approach, including significant retention of the existing structure and waste diversion from landfill, adds further importance to the project as a major example of adaptive reuse within the City of London.
ENVIRO’s role supports the technical delivery of this transformation, helping ensure that complex MEP systems are commissioned, tested and coordinated in line with project requirements.
Phoenix Mechanical Electrical delivered a comprehensive electrical services installation to support the operational demands of 21 Moorfields. This included small power, general power, UPS and lighting distribution boards, with dual supplies provided to key trader floors.
The wider installation included LV and MV fit out and distribution, general switchgear, base build MV supply, earthing and bonding, lighting control systems, general and emergency lighting, high-level power and cleaners’ circuits.
ENVIRO’s role focused on supporting the commissioning management, validation and close-out of MEP systems to help ensure the building could progress towards successful handover.
ENVIRO has supported T Clarke through a major headquarters refurbishment and fit-out project by providing structured MEP commissioning management across multiple service disciplines.
The team is responsible for managing and issuing more than 1,800 ATPs, authoring key heat-load and integrated system testing scripts, and leading integrated testing activity across the project.
Through hands-on commissioning leadership, technical coordination and documentation control, ENVIRO is helping support the successful progression of one of the City of London’s major commercial transformation projects.