The RIS Programme, short for Redesigning Inpatient Services in East Sussex, is a £60m healthcare development led by Sussex Partnership NHS Foundation Trust.
The project will centralise adult and older people’s acute mental health inpatient services in East Sussex into a single, specialist facility, officially named Combe Valley Hospital.
Located in Bexhill-on-Sea, the new 57,393 sq ft facility will provide 54 beds across three 18-bed wards, with individual en suite bedrooms, therapy spaces and outdoor rain gardens designed to support patient care, recovery and wellbeing.
The building has also been designed with sustainability in mind, including a highly insulated, fully electric design, solar panels and electric vehicle charging points.
RIS — Combe Valley Hospital, 2025 - 2026
Healthcare / Mental Health
Sussex Partnership NHS Foundation Trust
57,393 sq ft
Hybrid CxM / MEP commissioning management
Kier Group
New inpatient mental health facility
MEP commissioning, system integration, security coordination and HTM compliance
As a specialist mental health facility, the project requires careful coordination across MEP systems, security systems, compliance requirements and integrated testing activities.
Mental health environments place particular emphasis on system reliability, safety, security and operational control.
This made early engagement essential to ensure the correct commissioning planning, sequencing and handover strategy was in place from the outset.
As a healthcare project, the scheme also follows HTM guidance, requiring commissioning progression, documentation and system delivery to align with the relevant healthcare technical standards.
ENVIRO was contracted to provide MEP commissioning management and validation services for the project close-out phase.
The scope included managing commissioning activity across 24/7 shift patterns, supporting remedial water treatment, maintaining continued water management through to floor close-out, driving HVAC balancing teams to completion and ensuring commissioning documentation was reviewed, approved and signed off.
Employed by Kier, ENVIRO was appointed as a hybrid CxM and MEP commissioning management team.
The team engaged early in the project to support planning, commissioning strategy and handover preparation.
This early involvement helped ensure that system integration, security considerations and MEP commissioning requirements were properly coordinated before the project moved into critical testing and handover stages.
ENVIRO’s approach has focused on maintaining control across commissioning progression, ensuring that activities are planned, tracked and aligned with HTM guidance throughout delivery.
Verifying the current condition of mechanical systems on site.
Aligning outstanding commissioning actions with the wider project team.
Driving remedial works and progress across active work areas.
Maintaining clear documentation control through to handover.
Combe Valley Hospital is a significant healthcare development for East Sussex, bringing together acute inpatient mental health services within a purpose-built specialist facility.
The project combines clinical requirements, patient wellbeing, security, sustainability and technical building performance, creating a commissioning environment where early planning and structured coordination are critical.
ENVIRO’s involvement supports the successful integration and testing of building systems within a healthcare setting where compliance, reliability and safety are central to project success.
Phoenix Mechanical Electrical delivered a comprehensive electrical services installation to support the operational demands of 21 Moorfields. This included small power, general power, UPS and lighting distribution boards, with dual supplies provided to key trader floors.
The wider installation included LV and MV fit out and distribution, general switchgear, base build MV supply, earthing and bonding, lighting control systems, general and emergency lighting, high-level power and cleaners’ circuits.
ENVIRO’s role focused on supporting the commissioning management, validation and close-out of MEP systems to help ensure the building could progress towards successful handover.
ENVIRO has supported Kier through the commissioning planning and management of a technically sensitive healthcare project.
By providing early-stage CxM and MEP commissioning management support, ENVIRO has helped ensure that commissioning, handover planning, integrated testing and HTM compliance requirements are properly considered and coordinated.
The project demonstrates ENVIRO’s capability to support healthcare environments where system integration, security, safety and compliance must be managed with precision.